SRINAGAR: According to the Chief Engineer, JKPTCL Kashmir, in order to remove Cross Jumpers at Tower location no. LP-3 besides replacing damaged Earth wire between location no. LP-3 and LP-4, necessitated due to commissioning of 220 KV Lassipora-Wagoora Section of 220 KV WMTL, shutdown of 33KV Lassipora-Pulwama line, 33KV Lassipora-Keegam-Mitrigam line, 33KV Lassipora-Landoora line and 33KV Lassipora- New Reshipora line shall be observed due to which 33/11KV Receiving Stations at Pulwama, Pinglena, Tenghar, Covid Hospital, Mitrigam, Keegam, Gulshanabad, Chararipora, Landoora, Momen, Reshipora shall remain off while power supply to Pulwama Town, Tahab, Tenghar, Koil, Wasura, Chandgam, Litter, Arihal, Pinglena, Babhar, Pakharpora, Charipora, Akhal, Rajpora, Keegam, Gulshanabad, Wachi, Babapora, Landoora, Mantribugh, Ratnipora, Hermain, Hajipora, Zainpora, Turkewangan, Chitrigam, Reban and Nagbal areas will remain affected from 10.00 AM to 03.00 PM on 01 September, 2025.
Also, as per a separate shutdown schedule issued by Chief Engineer, JKPTCL Kashmir, in order to carry out replacement of buckled bottom cross arm and +6 mtr leg of tower no. 52 (D+6) of Circuit-I, shutdown of 33 KV Bandipora line, 33 KV Aloosa line, 33 KV Nadihal line and 33 KV Gurez line shall be observed due to which 33/11KV Receiving Stations at Aloosa, Ajar, Nusoo, Naidhal, Panzigam, Ajas, Dawar, Gurez shall remain off while power supply to Aloosa, Quail, Malangam,Nusoo, Naidhal, Ajas, Garoora, Papchan, Nishat, Argam, Ajar, Arin, Saderkoot, Sadnara, Authwatoo, Dawar, Wanpora, Tragbal and adjoining areas will remain affected from 08.00 AM to 03.00 PM on 31 August, 2025.